DSC_0527
_MG_4996
RReagan-Mem_Stevens-Pics-02

AMECO USA’s high-quality workmanship has been recognized by professionals in the construction and architectural fields and continues to be a valuable resource for our customers. Our decorative and functional fabrications have been integral components for the bridge industry, monuments and sculptures, and in general construction.

If your needs are as simple as hand-railings or stairs and staircases, or as complex as professionally designed art pieces, AMECO USA has the expertise and quality workmanship that will contribute to the aesthetics and functionality of your project.

harbordrivenight3
DSC_0501
07-2_AMECO-Wrap-Up-Slide_Rail-Post-900x600a

Following our exceptional performance in producing three Santiago Calatrava art sculptures for NYC, AMECO USA was again called upon to build a larger and more complex piece to be installed at River Point Plaza in Chicago, IL. These pieces are as large as 18’ tall and 36’ long and were erected on Park Avenue in New York City in early 2015.

Standing at over 30 feet tall, this Calatrava designed piece will become a landmark on the banks of the Chicago River. When erected in 2020, this striking contemporary piece will become a notable addition to the city of Chicago’s extensive public art projects.

Constructed from over 200 individual pieces of precision-cut aluminum plate, the piece will be test-assembled at our facility then disassembled into 33 separate sections for shipping.


Because of our reputation for high quality aluminum fabricating, AMECO USA was selected to produce three large-scale aluminum art pieces designed by Santiago Calatrava. These pieces are as large as 18’ tall and 36’ long and were erected on Park Avenue in New York City in early 2015.


AMECO USA’s full range of capabilities was required to build extensions for polished stainless steel arches that span Post Oak Boulevard in Houston, TX. Tight tolerances for both fit and finish were required to match the existing structures. The project was completed in March 2017 when the extensions had been installed on all 12 arches..